DV Hardware bringing you the hottest news about processors, graphics cards, Intel, AMD, NVIDIA, hardware and technology!

   Home | News submit | News Archives | Reviews | Articles | Howto's | Advertise
 
DarkVision Hardware - Daily tech news
December 5, 2016 
Main Menu
Home
Info
News archives
Articles
Howto
Reviews
 

Who's Online
There are currently 107 people online.

 

Latest Reviews
Zowie P-TF Rough mousepad
Zowie FK mouse
BitFenix Ronin case
Ozone Rage ST headset
Lamptron FC-10 SE fan controller
ZOWIE G-TF Rough mousepad
ROCCAT Isku FX gaming keyboard
Prolimatech Magnetic Pin
 

Follow us
RSS
 

450mm fabs may arrive in 9 years

Posted on Saturday, October 11 2008 @ 00:03:16 CEST by


Dean Freeman, an analyst with Gartner, expects the first 450mm fabs may appear in the 2017 to 2019 timeframe. This is later than some hoped but the costs involved with switching to 450mm are pretty massive:
As reported, Intel, TSMC and Samsung are separately pushing for the advent of 450-mm fabs by 2012 or so. Some believe 450-mm fabs will never happen, saying the R&D costs are too expensive.

If or when 450-mm appears, the first production fabs could emerge at the 8- or 5-nm nodes, somewhere between the 2017 to 2019 timeframe, said Dean Freeman, an analyst with Gartner Inc. And in total, it could cost a staggering $20-to-$40 billion to bring the next-generation wafer size to the market, Freeman said.

The price for a 450-mm toolset: $100 million!

But will 450-mm become a reality? Right now, it's a toss-up and it doesn't make sense, given the current economy. 450-mm will become a reality when the economics dictate the need for a new wafer size or when chip scaling ends, Freeman said.
More details at EE Times.


 



 

DV Hardware - Privacy statement
All logos and trademarks are property of their respective owner.
The comments are property of their posters, all the rest © 2002-2016 DM Media Group bvba