BSN*: What are priorities for GlobalFoundries at this point in timeā¦?
Tom: Right now, we have two priorities. Our number one priority is Fab 1 Module 2 and its ramp up with 32nm bulk technology. This is a key for swift transition to future manufacturing processes, such as 28nm "half-node" shrink. Our second priority is getting our initial Fab in place in Saratoga County.
Globalfoundries talks about the future
Posted on Saturday, May 30 2009 @ 9:31 CEST by Thomas De Maesschalck