Changelog:
  • Added support for automatic macros like now, projectstart and projectend.
  • Added monthly calendar HTML report.
  • Added period property as a shortcut for the combined use of start and end.
  • Added more details to the pop-up info for tasks and resources in the UI.
  • Added support for warnings and turned some non-critical errors into warnings.
  • Improved scheduling performance for projects with long dependency chains.
  • Added new attribute purge to clear inherited allocations and flags from a task or resource.
  • Fixed complexity explosion in loop detector and critical path analyzer. Larger projects that made heavy use of inherited dependencies had an exponentially growing run time of these components.
  • The threshold for the critical path detection now defaults to 10%. All pathes that have less than 10% slack time will be marked as critical.
  • Fixed problem where editor tools were doubled when "Open Recent" was used while editor was open. This also triggered a crash on program exit.
  • Fixed double headline problem in most HTML reports.
  • Fixed a bug in the coloring of tasks in HTML reports that had a 'complete' specification.
  • Fixed documenation for usage of sorting modes for scenario specific columns in reports and make them work properly.
  • Force now date to be aligned to the timing resolution.
  • Fixed a major bug in the handling of multiple scenarios. Values were inherited from peer scenarios instead of their parents.
  • More meaningful error messages for some impossible combinations of fixed start/end times and dependencies.
  • For technical reasons we had to limit the timingresolution between 5 minutes and 1 hour. Larger resolutions caused too many hazards in corner case situations.
  • Fixed gaplength for time units other than days.
  • Really hide all inherited dependency arrows in Gantt chart.
  • Fix several crashes when the user is viewing reports in the UI after an unsuccessfull scheduling run.
  • Fix sorting of tasks in interactive resource reports and sorting of resources in interactive task reports.
  • The resource reporting in htmlweeklycalendar reports has been fixed. The report can now be used in task or resource reporting mode. The default is the task reporting mode which is closest to the previous behaviour.
  • Fixed values of the revenue and profit column in resource reports. Resources can never generate a revenue so the value must always be 0.
  • Fixed crash when printing resource reports from the UI that had a hierarchyindex column.
  • The completion degree of container tasks that have sub tasks with and without resource allocations was reported as 0. This has been replaced with "in progress" as the completion degree cannot be calculated.

Program Information

Category:
Tools and Utilities
Type:
Free


Version:
2.3.1
Size:
1.2MB
Works on:
Mac OS X


Product page: here

Download: TaskJuggler 2.3.1



Loading Comments