TSMC confirms 450mm fab plans

Posted on Tuesday, February 01 2011 @ 14:49 CET by Thomas De Maesschalck
EE Times reports TSMC CEO Morris Chang confirmed plans to build a 450mm fab:
Now, TSMC tipped its plans. ''Last week, (TSMC CEO) Morris Chang obsoleted the world’s 300-mm with the blast of a conference call,'' said G. Dan Hutcheson, CEO of VLSI Research Inc., in a report.

''While it didn’t get much attention in the media, he said their first 450-mm line is planned for Fab 12 Phase VI. It will be for their 20-nm production ramp. According to Morris, 'The timing of the pilot line will be around 2013-2014. Our first 450-mm production line is planned for around 2015 -2016.' This is pretty much on schedule with the ITRS roadmap,'' Hutcheson said.

''The importance of this is that back in the 300-mm days, things really didn’t get going until TSMC announced a real fab. There was a lot of table pounding, but the supply base doesn’t get rolling until there are real orders. Orders are not real until there’s a fab in play,'' he said.


About the Author

Thomas De Maesschalck

Thomas has been messing with computer since early childhood and firmly believes the Internet is the best thing since sliced bread. Enjoys playing with new tech, is fascinated by science, and passionate about financial markets. When not behind a computer, he can be found with running shoes on or lifting heavy weights in the weight room.



Loading Comments