DV Hardware bringing you the hottest news about processors, graphics cards, Intel, AMD, NVIDIA, hardware and technology!

   Home | News submit | News Archives | Reviews | Articles | Howto's | Advertise
 
DarkVision Hardware - Daily tech news
August 19, 2017 
Main Menu
Home
Info
News archives
Articles
Howto
Reviews
 

Who's Online
There are currently 88 people online.

 

Latest Reviews
Zowie P-TF Rough mousepad
Zowie FK mouse
BitFenix Ronin case
Ozone Rage ST headset
Lamptron FC-10 SE fan controller
ZOWIE G-TF Rough mousepad
ROCCAT Isku FX gaming keyboard
Prolimatech Magnetic Pin
 

Follow us
RSS
 

NVIDIA shows off its new HQ to GTC 2017 attendees

Posted on Wednesday, May 10 2017 @ 13:09:23 CEST by


logo
As you may know, NVIDIA is building a big new headquarter with a design inspired by the triangles that are rendered by its GPUs. We first heard about the new building in 2013 and within a couple of months from now it should finally be ready.

NVIDIA gave some attendees of the GPU Technology Conference the opportunity to tour the new "Endeavor" headquarter, which is expected to be ready within five months. The project cost NVIDIA $370 million and offers 46,500 square meters of space divided into two floors.
There are in total 245 triangular skylights on the roof, which surprisingly is not covered in solar panels.

What’s interesting though is the fact that the whole building is literally water cooled. The recycled water will be piped into a tower sunk under the roof of Endeavor, which will be used to cool the building through “an evaporation system with three giant fans”.
NVIDIA HQ triangles everywhere

You can check out more photos at VideoCardz. One interesting thing is the building has no office for NVIDIA CEO Jen-Hsun Huang as he works in different buildings in various places.



 



 

DV Hardware - Privacy statement
All logos and trademarks are property of their respective owner.
The comments are property of their posters, all the rest © 2002-2017 DM Media Group bvba